✖ Close Social Content
Public Works

To navigate these projects, please refer to the organizing tabs located below, on the right side of the page.

For a list of current projects, click here. 


All Posts > District 2

District 2 Finished Projects

Bernalillo County contracts with ABQ Ride to provide bus service in both the North and South Valleys. In the past few years ABQ Ride has used American Recovery and Reinvestment Act (ARRA) funds to install 45 bus shelters along County routes (in ... Read More


District 2 Finished Projects

Scope includes the construction of a new underground storm drain along Arenal Road between Coors Boulevard and the Isleta Drain. The project will collect existing developed underground storm water flows coming from the NMDOT Coors Boulevard and ... Read More


District 2 Finished Projects

Project Scope

The Barcelona Road Storm Drain Project is a tributary of the South Valley Flood Reduction Project. This project consisted of road and drainage improvements for Barcelona Road from the Armijo Drain to the Isleta Drain. The constructed dra... Read More


District 2 Finished Projects

The project consists of roadway improvements at the Blake Road and Coors Boulevard intersection and storm drain improvements that will capture runoff at the intersection and will connect to the Isleta Drain.

Roadway improvements shall consist of the w... Read More


District 2 Finished Projects District 5

This project included a 3-inch asphalt overlay on Foothill Road from Bridge Boulevard to Blake Road with complete asphalt patching in the particularly bad areas.

The speed humps will be reconstructed, however they will remain in the same place and non... Read More


District 2 District 1

Project Scope

Construction of this project includes: pulverizing existing pavement and repaving with new pavement section; Install infiltrators parallel to the road where drainage issues are found on Ranchitos Road; placing new paving section on Calle... Read More


District 2 District 4 Finished Projects District 1 District 5 District 3

Project Scope

Fiber OpticsBernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greater bandwidth to carry digital information. Ind... Read More


District 2 Finished Projects

Project Scope

The project consists of roadway improvements between Bridge Boulevard and the Isleta/Arenal/Goff intersection and storm drainage improvements between Bridge Boulevard and the Sanchez Farm Pond in accordance with the “Sanchez Farm P... Read More


District 2 Finished Projects

This project involves the design and construction of 300 feet of storm drain on Hooper Road SW. The project has State Capital Improvement Project funding. The project will provide necessary drainage on Hooper Road.

General Project Information:

Sta... Read More


District 2 Finished Projects

Rio Grande Indoor Pool
2312 Arenal Road SW
Albuquerque, NM  87105
(505) 314-0169

The Bernalillo County Aquatics program follows the National Lightning Safety Institute recommendations for its indoor and outdoor pools.


District 2 Finished Projects

This project consists of geometric improvements to the intersection of Sage Road SW and Old Coors Road SW. The project includes adding 11-foot dedicated turn lanes, installation of permanent signals, improved lighting and ADA/crosswalk improvements.

(... Read More


District 2 Finished Projects

Project Scope

 

This project designed and constructed a 10-foot wide asphalt multi-use trail along the east side of Second Street, from Prosperity Avenue to the South Diversion Channel, approximately one mile.

The county entered into a Cooperative ... Read More


District 2 Finished Projects

This project is a joint effort of Bernalillo County, the Albuquerque Bernalillo County Water Utility Authority (ABCWUA), the State of New Mexico through legislative funding and federal funding through the state's Congressional delegatio... Read More


District 2 Finished Projects

This facility is located at 2008 Larrazolo Road SE

Project Scope

A new 3,250 square foot building addition to the South Valley Multipurpose Center is currently in design.

The new addition will be used for half-court basketball and many other approp... Read More


District 2 Finished Projects

Plan Overview

The plan area is located in Mountain View Neighborhood and is about 860 acres. The boundaries are Second Street SW on the west, Woodward Road —Sunport Boulevard on the north, I-25 on the east, and Rio Bravo Boulevard on the south. ... Read More


District 2 Finished Projects

Project Scope

Sunset Gardens Road Phase 2The project reconstructed Sunset Gardens Road, SW from the Arenal Acequia to Sunset Road, SW, then continued on Sunset Road SW to Trujillo Road SW, and continued east on Trujillo Road SW where it crossed an easement into the Va... Read More


District 2 Finished Projects

Project Scope

This project consists of reconstructing Tower Road from Stinson Street east, roughly 1,000 feet. The design will provide two driving lanes in each direction, bicycle lanes, completion of storm drainage infrastructure, installation of wat... Read More


District 2 Finished Projects

Project Scope

Vista del Rio, Phase 4 will construct a storm drain system (Phase 4A) in Vista del Rio Road, Elena Circle, Rinconado Lane, Perry Road, and Blake Road that will be collected in a new pond that will have a pump station (Phase 4B) that will... Read More


Powered by Real Time Solutions - Website Design & Document Management